Now it’s time for Christmas leave.

Last Monday was our last working evening.
The removal of the tank is now largely complete, the only thing left to remove is the bogie boxes on the left side and to lift out of the final drives. Then the hull and the body are ready to be sent off for blasting and priming. We ourselves have a million small things to clean, renovate, paint and rub before we can begin to assemble the tank again. There is no shortage of jobs for the foreseeable future.

Det jobbas (1) Det jobbas (3)Det jobbas (4) Det jobbas (2)

A big thanks to all of you who helped us and worked with the project during autumn and thus made the renovation possible.