The side doors are mounted. They are heavy and uncomfortable to handle but with help of the traverse crane it went well.
The cables of the headlights are drawn inside the engine compartment and it is crowded there .
The side doors are mounted. They are heavy and uncomfortable to handle but with help of the traverse crane it went well.
The cables of the headlights are drawn inside the engine compartment and it is crowded there .
Now the floor, the right ammunition rack and the back door in place as well as the rack on the outside.
Now the driver’s seat is getting ready. The joysticks and pedals and floor are mounted. The dashboard is in place and the power is plugged in. In the empty hole to the left of the dashboard, the temperature gauge must be seated.
Under the support wheels of the track, diverting plates are mounted. On these, all clay and other dirt that get caught in the track should slip away so that it does not remain in the track arrangement.
The work on the carriage continues. Now the fuel tank and cooler are back in their original locations. The front of the floor in the combat area is also in place. However, the driver’s seat is far too high and must be lowered, because if you are longer than 150 cm you will hit your head.