A review

More than 4 years have passed since we started renovating the 21-29th. We started with a complete wagon, which we were going to make ready for driving. We rolled it into the workshop

and after a few months it was mounted down and turned into a lot of loose parts packed in pallets and pink plastic bags.

Then the work began to blast and paint all loose parts. The larger parts we did not manage by ourselves so we sent them to a blasting company that had significantly better resources than we did.

When everything was blasted and painted, we started to assemble the wagon, which consisted of two main parts, body and undercarriage. The body was not so complicated, it was only doors, a tower and instrumentation that was to be mounted. The undercarrige contains of the power pack and the driving line and it was a hard jobb to get everything in correct order.

Then came the big moment when the engine and driving line were tested.

What remains is to fix the tracks and to mount the body. There is still a lot to do but now we see the beginning of the end of the renovation.