Post navigation ← Previous Next → The bogie boxes are in place. Posted on 29 September, 2015 by Lars-Erik Mattsson The bogie boxes except one are now in place in the frame, there are only some screws missing. When they are in place, it is time to turn the frame with the right side up. Thereafter, the final drives will be prepared and mounted. Share this:Like this:Like Loading...
Leave a Reply